GuidesWho it is for
Manufacturers and contractors use Triworld when equipment, materials, or components must be sourced and moved against a specification and a site or factory date.
Work from the part, material, or machine the buyer names.
Plan air or ocean against the date the goods are needed.
Align invoices and packing lists with what will arrive.
A factory needs components before production waits.
A contractor needs the first materials or tools by a start date.
A machine is sourced and shipped. Installation on site is not part of the service.
No. The work is sourcing and cargo coordination, not site installation.
Only if a carrier accepts the weight, size, and route. Otherwise the job is planned by ocean.